Project Inception: March, 2011
Project Revised: June, 2012
Project Completion: September, 2015

Mymensingh Strategic Development Plan (MSDP) Project, 2011-2031

Step 13 :: Drainage Map
  • Prepare Drainage Map from Field Survey By Using RTK GPS and Total Station and GIS Software    
  • Inentify Missing link of Khal from Mauza Map    
  • Identify missing link from DEM     Download All Map
  • Prepare Drainage Map for Print    
  • Detailed Field survey for Drainage and flow Direction    
  • Identify flow Direction    
  • Define Catchment Area for Drainage     Download All Map
  • Edit Drain database    
  • Prepare Flow Direction Map    
  • Prepare Catchment Area Map and Print    
  • Re Edit by Expert    
  • Re prepare Catchment Map and Print    
  • Finalize Catchment Area and prepare Database    
  • Calculate rainfall data    
  • Link Rainfall data and Analyze    
  • Prepare Drain junction    
  • Analyze Drainage data and prepare Flooding node By Using Pcswmm Software    
  • Find Flooding Area     Download All Map
  • Finalize Drainage Map     Download All Map